Railroad Tree Clearing - $110k
ACHUTI fully self performed this project. Located at Fort Bragg ARMY installation, the scope called for clearing debris and cutting overhead limbs that had fallen into the railway and was obstructing the canopy of passing trains. Achuti utilized an excavator made for high-rail applications. Using a hydraulic mulching head, we cleared over 10 miles of train track up to 25 ft high.
The project has lead to additional civil work projects for Achuti at Fort Bragg.